Advocating for pedestrians, cyclists, traffic calming, and public transit in South Orange, NJ
GREENWAY
Advocating for pedestrians, cyclists, traffic calming, and public transit in South Orange, NJ
GREENWAY
South Orange and Maplewood are working to create a Greenway along the Rahway River. A greenway is a corridor connecting parks and other open spaces, providing a place for car-free walking, biking, and scootering, while also protecting waterways and natural habitat. Click the links below to jump to the status of each segment as of 2026.
STATUS: TBD with plans under consideration
As of 2026, Maplewood Engineering committee is still considering plans for bike lanes on Dunnell Rd between Baker St and Jefferson Ave. These plans were first drafted by Dynamic Traffic in 2024.
Connects to Maplewood Middle School, Maplewood Library, Memorial Park, and Maplewood Train Station.
Paths in Memorial Park are too narrow and are not being considered.
STATUS: COMPLETED
In August 2024, the existing path between Jefferson Ave and the Columbia HS student parking lot was repaved and improved using funds from the Gleason developer.
Maplewood restriped the CHS parking lot to add a path for walking and biking on the west side of the parking lot.
Connects to the bike lane on Parker Ave (from Maplewood Ave to Irvington Ave).
Connects to Columbia High School and the South Mountain YMCA Child Care facility.
Village Green: Maplewood River Greenway Opens a New Path—Just in Time for School
STATUS: Under construction 2026-2027
Construction started in August 2026 and is expected to be completed in early 2027.
Connects to the bike lane on Parker Ave (from Maplewood Ave to Irvington Ave).
Chyzowych Driveway to be repaved and striped at the end of Phase 2 construction.
New paved multi-use path along Chyzowych Field.
Connects to the DPW & Library Annex Driveway, which provides connection to Walton Ave and points west.
New bridge over the Rahway River will be built, after which the old falling-apart bridge will be removed.
Existing paved paths at Waterlands Field will be repaved.
Sharrows (shared bicycle use markings) on the Waterlands Park Driveway to W 3rd St.
Connects to sharrows on 3rd St and Church St to access South Orange Ave.
Funded by $4 million grant + from federal, state and county funds, originally awarded 10 years ago!
Village Green, 2026: South Orange Village Announces Start of Construction on Phase 2 of the River Greenway Project
Village Green, 2015: South Orange announces $1 million grant for River Greenway Project
STATUS: TBD with land access under negotiation
South Orange is negotiating a redevelopment of the NJ Transit lot. Part of the agreement would include creation of the Greenway directly along the river through the NJT lot.
Would run past the South Orange Commons (new JESPY development) from W 3rd along the river past the Village Station East parking lot and through the NJ Transit lot to South Orange Ave.
Connects to SOPAC, South Orange Train Station and South Orange Downtown.
Village Green: Mayor Collum Says NJ Transit Lot Development Project May Be Back on Track
STATUS: Under construction fall 2026
In fall 2026, they are repaving and adding sharrows (shared route bicycle markings) to W 3rd St and Church St.
During 2025, South Orange held public meetings to consider adding a formal bike lane to Church St, but decided on sharrows instead.
This will be the interim Greenway connection between Waterlands Park and Meadowland Park for several years until a more direct route can be constructed through the NJT lot.
STATUS: COMPLETED, with further improvements in 2026/2027
This was the first phase of the Greenway, completed in two parts between 2008 and 2014, using $4 million in federal, state, and county grants.
Path near the Pool to be repaved after the Cameron Recreation Area construction is complete in 2026.
This construction was based on the River Greenway Master Plan, prepared by Rhodeside and Harwell and issued by the Village of South Orange in 2007.
Runs through the east side of Meadowland Park from South Orange Ave, past the Pool, crosses Mead St, past the Baird, crosses a bridge over the river, and follows a dirt path up Meadowbrook Lane to Meadowbrook Pl.
Connects to South Orange Downtown, South Orange Middle School, South Orange Pool, Baird Community Center.
Connects to the bike lane on Mead St from Meadowbrook Ln to Vose Ave.
STATUS: TBD with no plans under consideration yet
Although there are no recent discussion of plans, this phase is in the original River Greenway Masterplan.
This phase will provide pavement striping and signage, to create a walk and bike connection to near the border with Orange.
Connects to the bike lane on West Montrose Ave (from Ridgewood to Scotland).
Connects to Mountain Train Station.
Potential connection to Metcalf Park in Orange.